The action was based on a Severity Level III problem consisting of: 1) a failure to maintain an adequate lube oil collection system for reactor coolant pumps, which resulted in oil accumulation on fibrous insulation, creating the potential for a fire; and 2) a failure in two instances to take prompt action to identify and correct conditions which resulted in the fire.